The article deals with the main problems arising during the sustainable renovation process and energy refurbishment of historical architecture. In particular, it focuses on the feasibility study for a huge historical listed building, aiming at its progressive and complete re-utilization as university campus, respectful of the many cultural values of which it is the depository. The complex of the ‘Albergo dei Poveri’ was built in Genoa between the late seventeenth century and the middle of the nineteenth, as a monumental structure for charitable purposes. Given its size and location in the heart of the city, it still represents an important urban structure and a great opportunity for urban renewal, even though it is actually almost completely abandoned. Main aim of the research is the definition, from a methodological and technical point of view, of feasibility studies in order to submit the historical monumental heritage to a process of ‘energy efficiency’ and ‘energy production’, even recurring to the most suitable technologies supplied by renewable energies. In this paper, a preliminiary approach and general criteria for the building refurbishment, in relation to the architectural and historical commitments, are presented.
Towards a systematic approach for energy refurbishment of historical buildings: the case study of Albergo dei Poveri in Genoa, Italy
FRANCO, GIOVANNA;
2015-01-01
Abstract
The article deals with the main problems arising during the sustainable renovation process and energy refurbishment of historical architecture. In particular, it focuses on the feasibility study for a huge historical listed building, aiming at its progressive and complete re-utilization as university campus, respectful of the many cultural values of which it is the depository. The complex of the ‘Albergo dei Poveri’ was built in Genoa between the late seventeenth century and the middle of the nineteenth, as a monumental structure for charitable purposes. Given its size and location in the heart of the city, it still represents an important urban structure and a great opportunity for urban renewal, even though it is actually almost completely abandoned. Main aim of the research is the definition, from a methodological and technical point of view, of feasibility studies in order to submit the historical monumental heritage to a process of ‘energy efficiency’ and ‘energy production’, even recurring to the most suitable technologies supplied by renewable energies. In this paper, a preliminiary approach and general criteria for the building refurbishment, in relation to the architectural and historical commitments, are presented.File | Dimensione | Formato | |
---|---|---|---|
1-s2.0-S0378778814008962-main.pdf
accesso chiuso
Descrizione: Articolo principale
Tipologia:
Documento in versione editoriale
Dimensione
1.78 MB
Formato
Adobe PDF
|
1.78 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.