We propose a Simulation-Based Design Optimization (SBDO) approach for the design of an Energy Saving Device (ESD) based on the Wake Equalizing Duct (WED) concept. Pre-Ducts, like Wake Equalizing Ducts, reduce the wake losses, improve the propeller-hull interaction and generate an additional thrust. An integrated design approach, relying on a parametric description of the duct geometry of the WEDs and on a RANSE method, managed by a global convergence optimization algorithm, is developed to maximize the delivered thrust. The Japan Bulk Carrier (JBC) test case, for which model scale experimental data on the effectiveness of the WED are available in the literature, is considered as a baseline. Results obtained by using the adaptive, fully automated proposed design framework highlight significant improvements of the overall propulsive efficiency when the Pre-Duct design is tailored to the actual hull wake shape. In addition, off-design conditions are considered to verify the robustness of the proposed designs with respect to variations of the working point and discuss the opportunity of a robust optimization process.

Design of Wake Equalizing Ducts using RANSE-based SBDO

Furcas F.;Vernengo G.;Villa D.;Gaggero S.
2020-01-01

Abstract

We propose a Simulation-Based Design Optimization (SBDO) approach for the design of an Energy Saving Device (ESD) based on the Wake Equalizing Duct (WED) concept. Pre-Ducts, like Wake Equalizing Ducts, reduce the wake losses, improve the propeller-hull interaction and generate an additional thrust. An integrated design approach, relying on a parametric description of the duct geometry of the WEDs and on a RANSE method, managed by a global convergence optimization algorithm, is developed to maximize the delivered thrust. The Japan Bulk Carrier (JBC) test case, for which model scale experimental data on the effectiveness of the WED are available in the literature, is considered as a baseline. Results obtained by using the adaptive, fully automated proposed design framework highlight significant improvements of the overall propulsive efficiency when the Pre-Duct design is tailored to the actual hull wake shape. In addition, off-design conditions are considered to verify the robustness of the proposed designs with respect to variations of the working point and discuss the opportunity of a robust optimization process.
File in questo prodotto:
File Dimensione Formato  
1-s2.0-S014111871930690X-main.pdf

accesso chiuso

Descrizione: Articolo su rivista
Tipologia: Documento in versione editoriale
Dimensione 5.29 MB
Formato Adobe PDF
5.29 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11567/1007973
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 25
  • ???jsp.display-item.citation.isi??? 23
social impact