An analytical approach to assess the mini hydropower potential is proposed on a GIS platform. The mini hydropower potential is defined in terms of a synthetic index that measures the investment feasibility of a given hydropower plant. The investigation of the mini hydropower potential is performed at the catchment scale by integrating: catchment morphometric analysis; setting criteria for locating the weirs and powerhouses; hydrological modelling; engineering analysis; economic analysis and mapping. The integrated approach has been tested on the Arroscia catchment (Italy) where 27 weir sections have been examined thus resulting into 640 evaluated mini hydropower plant alternatives. Hydropower potential results indicate that in 14 over 27 sub-catchments it is possible to select at least a specific powerhouse location where the investment is affordable. The determination of MHP indexes in a simplified framework overcomes the typical problem due to the single prediction of hydropower potential for a specific plant configuration. The comprehensive MHP analysis allows to supports the energy management strategies while ensuring the sustainable water resource management at the catchment scale.

An Integrated GIS Approach to Assess the Mini Hydropower Potential

PALLA, ANNA;GNECCO, ILARIA;LA BARBERA, PAOLO;
2016-01-01

Abstract

An analytical approach to assess the mini hydropower potential is proposed on a GIS platform. The mini hydropower potential is defined in terms of a synthetic index that measures the investment feasibility of a given hydropower plant. The investigation of the mini hydropower potential is performed at the catchment scale by integrating: catchment morphometric analysis; setting criteria for locating the weirs and powerhouses; hydrological modelling; engineering analysis; economic analysis and mapping. The integrated approach has been tested on the Arroscia catchment (Italy) where 27 weir sections have been examined thus resulting into 640 evaluated mini hydropower plant alternatives. Hydropower potential results indicate that in 14 over 27 sub-catchments it is possible to select at least a specific powerhouse location where the investment is affordable. The determination of MHP indexes in a simplified framework overcomes the typical problem due to the single prediction of hydropower potential for a specific plant configuration. The comprehensive MHP analysis allows to supports the energy management strategies while ensuring the sustainable water resource management at the catchment scale.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11567/840356
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 9
  • ???jsp.display-item.citation.isi??? 8
social impact