The purpose of this study was the development of a simulation model to verify the logistic feasibility of the construction of a new regazification offshore terminal feeding a power plant located in Africa, subjected to a possible future doubling. In particular the model was used to test the proper supply of LNG (Liquefied Natural Gas) in the power plant real operating conditions and with particular reference to certain sizing configurations of vessels involved (dimensional range for tank buffer, shuttle ship size range). The model, taking into account sea conditions data available on site, extensively characterized during the oceanographic studies made, and with reference to defense works type realization and preliminary sizing (and specifically the breakwater dam and the its effect on the perturbation conditions in the proximity of the ship's mooring points) has assessed the risk of the power plant supply failure and the consequent lack of production (Unavailability of LNG or shut down). Moreover, the model estimated, for the scenarios simulated, the residence berthing times, the maximum frequency of unloading and the mooring / unmooring frequency reachable.

A system dynamics approach for managing the LNG procurement for an offshore platform feeding a power plant

CABALLINI, CLAUDIA;REVETRIA, ROBERTO;TESTA, ALESSANDRO
2010-01-01

Abstract

The purpose of this study was the development of a simulation model to verify the logistic feasibility of the construction of a new regazification offshore terminal feeding a power plant located in Africa, subjected to a possible future doubling. In particular the model was used to test the proper supply of LNG (Liquefied Natural Gas) in the power plant real operating conditions and with particular reference to certain sizing configurations of vessels involved (dimensional range for tank buffer, shuttle ship size range). The model, taking into account sea conditions data available on site, extensively characterized during the oceanographic studies made, and with reference to defense works type realization and preliminary sizing (and specifically the breakwater dam and the its effect on the perturbation conditions in the proximity of the ship's mooring points) has assessed the risk of the power plant supply failure and the consequent lack of production (Unavailability of LNG or shut down). Moreover, the model estimated, for the scenarios simulated, the residence berthing times, the maximum frequency of unloading and the mooring / unmooring frequency reachable.
2010
9789604742301
9789604742301
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11567/843409
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 6
  • ???jsp.display-item.citation.isi??? 1
social impact