Power system restoration is usually achieved by means of diesel generators (DG) which energize the grid following a bottom-up approach. This work deals with the capability of a Battery Energy Storage System (BESS) to energize a large traditional power plant from blackout. The analysis is proposed taking into account overcurrent issues associated to the power transformer energization and asynchronous motor starting, which are often likely to impact on DC/AC converters causing possible protections interventions, so avoiding a successful soft start

Soft-Start Capabilities of Battery Energy Storage Systems: Simulative Analysis of an Applicative Test-Case

Aresi R.;Bonfiglio A.;Mestriner D.;Pongiglione P.;
2022-01-01

Abstract

Power system restoration is usually achieved by means of diesel generators (DG) which energize the grid following a bottom-up approach. This work deals with the capability of a Battery Energy Storage System (BESS) to energize a large traditional power plant from blackout. The analysis is proposed taking into account overcurrent issues associated to the power transformer energization and asynchronous motor starting, which are often likely to impact on DC/AC converters causing possible protections interventions, so avoiding a successful soft start
2022
978-1-6654-4280-0
File in questo prodotto:
File Dimensione Formato  
2022064354.pdf

accesso chiuso

Descrizione: Contributo in atti di convegno
Tipologia: Documento in Post-print
Dimensione 665.4 kB
Formato Adobe PDF
665.4 kB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11567/1096301
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? 0
social impact