Sfoglia per Autore  

Opzioni
Mostrati risultati da 21 a 40 di 172
Titolo Data di pubblicazione Autore(i) File
Sistemi Integrati di Gestione Avanzata per la Quick Response della Catena di Fornitura 1-gen-2002 Mosca, Roberto; Bruzzone, Agostino; Revetria, Roberto; Tonelli, Flavio
Web Based Application and Artificial Neural Networks for Life Cycle Assesment in Industry 1-gen-2002 Revetria, Roberto; Tonelli, Flavio
Using Applet-Based Application to Improve Practices in Environmental Production Monitoring 1-gen-2002 Revetria, Roberto; Tonelli, Flavio
Drawing the relationships between the technological level of a manufacturing system and the maintenance policies. 1-gen-2002 Berlingieri, G; Mosca, Roberto; Queirolo, F; Tonelli, Flavio
Warehouse layout design: minimizing travel time with a genetic and simulative approach - methodology and case study. 1-gen-2002 Nan, P; Queirolo, F; Schenone, M; Tonelli, Flavio; Zunino, I.
Job sequencing problem in a semi-automated production process. 1-gen-2002 Mosca, Roberto; Queirolo, F; Tonelli, Flavio
Constrained Production & Procurement Planning for SCM by using Simulation and Top-Down analysis. 1-gen-2003 Bernocco, M; Genta, M; Tonelli, Flavio
Decision Support System: a custom application for manufacturing SME to plan and control the production. 1-gen-2003 POZZI COTTO, S; Tonelli, Flavio; Mosca, Roberto
Simulation models for the feasibility and reworking study of aircrafts 1-gen-2003 Giribone, Pietro; Melioli, Riccardo; POZZI COTTO, Sergio; Tonelli, Flavio
Competency Needs Induced by Production Model Innovation: the starting point of BATCOS project. 1-gen-2003 Ruffino, M; POZZI COTTO, S; Queirolo, F; Tonelli, Flavio
Jobs sequencing in industrial plants by multi-objective optimization based on a system of autonomous genetic agents 1-gen-2003 Mosca, Roberto; Queirolo, Filippo; Tonelli, Flavio
A Supervised Multi-Agent Approach for APS in Multi-Site Production Systems for Demand Validation and Evaluation 1-gen-2003 Bernocco, M; Schenone, M; Queirolo, F; Tonelli, Flavio
A stochastic approach to identify supply requirements, at an aircraft assembly plant, with respect to the MPS and production policies. 1-gen-2003 Giribone, Pietro; POZZI COTTO, S; Queirolo, F; Tonelli, Flavio
Level of service planning through Inventory planning, master production scheduling and available to promise procedures 1-gen-2004 Tonelli, Flavio; Melioli, Riccardo; S., DEL MONTE
A Quantitative Approach To Evaluate The Impact Of Product Life Cycle on Lay-Out Redesign. 1-gen-2004 Giribone, Pietro; Melioli, Riccardo; Tonelli, Flavio
Factory Events: a tool for monitoring performances of production processes in industries adopting Manufacturing Execution Systems. 1-gen-2004 Tonelli, Flavio; P., Lunghi; M., Calamita; P., Campo
The Impact Of Product Life Cycle on Lay-Out Redesign 1-gen-2004 Giribone, Pietro; Melioli, R.; Tonelli, Flavio
Manufacturing Execution System: Production Performance Information in Industry operating in the plastic sector. 1-gen-2004 Tonelli, Flavio; L., Cambiganu
Management of material handling in a company producing agricultural and industrial equipment by an MES application. 1-gen-2004 Tonelli, Flavio; P., Lunghi; M., Calamita; L., Cambiganu
A Supervised Multi-Agent Approach for Operations Capacity Planning through Performances-driven Analysis 1-gen-2004 Tonelli, Flavio; R., Melioli; M., Calamita; P., Lunghi
Mostrati risultati da 21 a 40 di 172
Legenda icone

  •  file ad accesso aperto
  •  file disponibili sulla rete interna
  •  file disponibili agli utenti autorizzati
  •  file disponibili solo agli amministratori
  •  file sotto embargo
  •  nessun file disponibile