During the Long Shutdown 2 of the LHC, the LHCb collaboration will replace the upstream Ring Imaging Cherenkov detector (RICH 1). The magnetic shield of the current RICH 1 will be modified, new spherical and plane mirrors will be installed and a new gas enclosure will be manufactured. New photon detectors (multianode photomultiplier tubes) will be used and these, together with their readout electronics, require a new mechanical support system. This document describes the new optical arrangement of RICH 1, its engineering design, installation and alignment. A summary of the project schedule and institute responsibilities is provided.

LHCb Upgraded RICH 1 Engineering Design Review Report

Cardinale, Roberta;Petrolini, Alessandro;
2016-01-01

Abstract

During the Long Shutdown 2 of the LHC, the LHCb collaboration will replace the upstream Ring Imaging Cherenkov detector (RICH 1). The magnetic shield of the current RICH 1 will be modified, new spherical and plane mirrors will be installed and a new gas enclosure will be manufactured. New photon detectors (multianode photomultiplier tubes) will be used and these, together with their readout electronics, require a new mechanical support system. This document describes the new optical arrangement of RICH 1, its engineering design, installation and alignment. A summary of the project schedule and institute responsibilities is provided.
File in questo prodotto:
File Dimensione Formato  
LHCb-PUB-2016-014.pdf

accesso aperto

Tipologia: Documento in versione editoriale
Dimensione 7.56 MB
Formato Adobe PDF
7.56 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11567/901059
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact