Molten carbonate fuel cells (MCFCs) have received a great deal of attention in recent years and are now at a pre-commercial stage. In this work, referring to the simulation experience of the Department of Environmental Engineering of the University of Genoa (DIAM), the process analysis of a reference 500kW MCFC plant will be presented. The new philosophy of distributed energy supply for the production and the distribution of electrical energy focuses its attention on plants with a power size in the range of 1–10MW. For this reason the simulation of a 1MW MCFC system will be considered, both on the basis of a 500kW plant scheme, and taking into account some modifications for improving its performance, and the results of the simulation will be discussed.

Process analysis of 1MW MCFC plant

BOSIO, BARBARA
2007-01-01

Abstract

Molten carbonate fuel cells (MCFCs) have received a great deal of attention in recent years and are now at a pre-commercial stage. In this work, referring to the simulation experience of the Department of Environmental Engineering of the University of Genoa (DIAM), the process analysis of a reference 500kW MCFC plant will be presented. The new philosophy of distributed energy supply for the production and the distribution of electrical energy focuses its attention on plants with a power size in the range of 1–10MW. For this reason the simulation of a 1MW MCFC system will be considered, both on the basis of a 500kW plant scheme, and taking into account some modifications for improving its performance, and the results of the simulation will be discussed.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11567/297995
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 37
  • ???jsp.display-item.citation.isi??? 35
social impact