The assessment procedure of a 90-years old, nailed steel Italian railway bridge, the Campasso Bridge, is discussed. The attention is focused on the material characterization, on the evaluation of the corrosion of the structural members and on the calibration of a structural model. The comparison of the results given by 1D, 2D and 3D models, compared to the outcomes of a load test, allowed the identification of a reliable structural model. On this basis, it is showed that the bridge can be re-opened to heavy commercial railway traffic provided only one of the rails is kept in service and provided few rehabilitation works are performed

Assesment and rehabilitation of a nailed railway bridge

BRENCICH, ANTONIO;GAMBAROTTA, LUIGI
2004-01-01

Abstract

The assessment procedure of a 90-years old, nailed steel Italian railway bridge, the Campasso Bridge, is discussed. The attention is focused on the material characterization, on the evaluation of the corrosion of the structural members and on the calibration of a structural model. The comparison of the results given by 1D, 2D and 3D models, compared to the outcomes of a load test, allowed the identification of a reliable structural model. On this basis, it is showed that the bridge can be re-opened to heavy commercial railway traffic provided only one of the rails is kept in service and provided few rehabilitation works are performed
2004
9789058096807
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11567/249976
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact